Description
The centre column of a concrete downstand beam was removed. To absorb the new bending moments and minimize the deformations, re-bar 16 was used. …
Description
The concrete ceiling of an office building was to be refurbished and upgraded for new live loads. Tecnotest AG carried out material analyses (reinforcing …
Description
Due to the new tenant Aldi’s demand for higher loads in the sales area, the flat ceiling built in 1977 had to be structurally …
Description
The conduits of the ‘Passerelle du pays d’enhaut’ in St.-Légier-Fenil are part of the water supply of the city of Lausanne. As part of …
Description
A new wall opening had to be made for a building extension. In this cantilevered area, the concrete wall absorbs high vertical forces and …
As part of a seismic strengthening project, several masonry walls in a residential complex in Wabern near Bern were examined for their stability in …
Description
The shopping centre Zugerland was renovated. An important concrete slab above the parking garage had to be strengthened. With the planned new use of …
Description
Due to increased loads and new requirements in the standards, small deficits with regard to shear punching had to be strengthened in a commercial …
Description
A concrete beam was hit by an incorrectly placed core drilling. Prestressing wires and the internal steel reinforcement was damaged. To compensate for the …
Description
The almost 100-year-old historic Felsenhof on Pelikanstrasse in Zurich was completely renovated. Due to changes in the static system, various concrete ceilings were reinforced …