Description
The listed «Alte Bauamt» in Dietikon’s Kronenareal has already experienced quite a bit since it was built in 1777. Now another chapter is to …
Description
An exciting application of memory®-steel ribbed steel arose in the upgrading project of the Schöneggweg motorway overpass between Rheinfelden and Frick.The road bridge was …
Description
As part of the structural work to take up the earthquake load case “insufficient shear resistance of the masonry walls in its initial phase”, …
Description
Due to many openings in a concrete slab on the GVRZ site, the construction had to be reinforced for bending. A solution with a …
Description
Various core drillings had to be made in the heavily reinforced concrete slab. Significant punching shear reinforcements were cut and the tensile reinforcement on …
Description
As a result of various drillings, severed prestressed wires (Ø5 mm, winding method) had to be replaced in a concrete tank of the GVRZ …
Description
In the course of modifications and new loads, a ceiling slab had to be strengthened. The slab is supported by rows of columns and …
Description
Due to high vertical loads on a reinforced concrete foundation, a prestressed reinforcement is necessary in order to reduce splitting forces and related crack …
Description
A stone arch bridge was widened on one side between 1950 and 1970 by a reinforced concrete construction consisting of 2 girders and 1 …
Description
A reinforced concrete bridge was renovated as part of various renovation works at the ‘Mühleteich’ in Riehen. As the intermediate support on the underside …